Field Inspection is billed at the rate of $50.00
per hour.
If the installation of storm sewers or storm water detention is performed
without calling for inspection by the Department of Public Works, we will
invoice for the inspection time prior to the
acceptance based on the Hamilton County Department of Public Works
estimate of time that would have been expended by the Public Works Inspector.
All new storm sewer, surface drainage
construction, storm water detention facility construction and construction of
temporary erosion control measures are to be under the inspection and
supervision of the Public Works Department. Phone 946-4750 or if you know the
inspector on your project call him at least two days in advance of construction.
SDS Review and Inspection Fees Revised
Effective August 1, 2007
![]()
David Padur - 946-4761
Jeff Specht - 946-4762
Steve Loesch - 946-4763
SDS Regulations
HCSWD Regs
ODOT Std Dwgs
Detention Photos 1
Detention Photos 2
Section A-A Photos
Plat Examples
Inspection
Downspout Regs
Look
Calculators
Subdivisions
SDS Approval
Text Only | Home | Services | Departments | Phone Directory | Customer Feedback
Contact Webmaster | Report a Problem On This Page | Report Email Problem
Copyright 2009. Hamilton County Ohio. 138 E. Court Street, Cincinnati, OH 45202.
Information on this site is believed to be true and accurate. Hamilton County disclaims any liability for errors or omissions.
External links to other sites are intended to be informational and do not have the endorsement of Hamilton County.